Montgomery Porta Pros coordinates temporary power pole setup for construction sites, events, and remote work areas that need electricity before permanent service is live. A typical setup runs a 200 amp service off a metered pole, built to feed job trailers, tools, and site lighting until the permanent utility connection is ready, and it pairs naturally with a porta potty rental ordered for the same mobilization window.

  • Serving the metro year round
  • Weekly servicing included

What Is a Temporary Power Pole?

A temporary power pole, sometimes called a temp pole or spider box on a post, is a freestanding structure that holds a meter base, breaker panel, and outlets so a site can draw power before permanent electrical service exists. Contractors use them constantly alongside construction site services in Montgomery, especially on ground-up builds where the utility company has not yet energized the building. The pole itself gets set in concrete or a temporary base, then the utility runs service to the meter, much like the groundwork covered in our porta potty placement guide for siting other equipment. From there, breakers feed light towers, saws, pumps, and anything else drawing amperage on site, the same way a temporary power pole job often runs near a 10 yard dumpster rental staged for debris. Most jobs pair the pole with a construction dumpster rental and a portable toilet rental since all three show up in the same early mobilization phase. If you are also renting a restroom trailer rental for crew comfort, that unit may need its own dedicated circuit off the same pole, so plan the load before delivery day, and check the OSHA portable toilet requirements page while you are scheduling both.

How Much Does Temporary Power Pole Installation Cost in Montgomery?

Installation cost depends on amperage, how far the pole sits from the utility connection point, and whether trenching or extra conduit is needed. A 200 amp pole for a mid-size commercial job costs more than a 100 amp pole for a single-family renovation, and rural sites near Prattville or Wetumpka can run higher if the utility has to extend farther. Get firm numbers through a request a quote rather than guessing, since site conditions swing the price more than anything else. Many contractors bundle the pole quote with a temporary fence rental walkthrough, since both need a site visit to measure clearance and access, and some add a chain link temporary fence around the meter base for security. If your project also needs a storage container rental, a 40ft storage container, or mobile office trailer rental, ask about running a subpanel off the main pole instead of ordering a second service, which usually costs less than two separate connections.

On the job with our local crew

Do I Need a Permit for a Temporary Power Pole?

Yes, in almost every case, because the utility company and the local inspection authority both have to sign off before a temp pole gets energized. Placement in the public right of way needs confirming with the city of Montgomery directly, since permit rules and inspection steps vary by jurisdiction and were not part of what we verified for this page. Get that confirmation before scheduling delivery. On active construction sites, OSHA 1926.404(b)(1)(ii) requires ground fault circuit interrupter protection on the circuits running off that pole, which matters once tools and extension cords start pulling from it daily. Site electricians typically handle the GFCI setup, but confirm it is in place before crews plug in. Pair your permit conversation with a look at dumpster permit requirements in Montgomery, since site mobilization often triggers more than one permit at once, and missing either one can delay the whole schedule by a week or more; the same logic applies to porta potty permit requirements if units sit near the right of way.

How long does temporary power pole installation take?

Once the utility approves the connection point, physical installation of the pole itself typically takes a day. The longer wait is usually the utility company's inspection and energizing schedule, which can add several days depending on their queue in the Montgomery area, so build slack into your construction site services timeline.

Can I rent a temporary power pole without also renting the meter?

No. The meter base is part of the pole assembly and the utility company requires it to measure usage before service gets energized. Rental packages include the meter base as standard equipment.

What size power pole do I need for a construction site?

It depends on total load: welders, compressors, lighting, and trailer HVAC all add up. A 100 amp service covers small residential jobs; a 200 amp temporary power pole handles most mid-size commercial sites. An electrician can calculate exact draw before you order, similar to how our how many porta potties do I need guide walks through sizing sanitation for a crew.

Does the power pole need its own inspection?

Yes, separate from any building inspection. The utility and the local electrical inspector both check the temp pole setup before energizing it, since it's treated as its own temporary service point.

Can a temporary power pole run alongside a restroom trailer or handwashing station?

Yes, and it often should. A restroom trailer rental with climate control or a handwashing station rental with heated water draws power, so run those loads through your site electrician's calculation before the pole gets sized.

On the job with our local crew

Next step

Get a delivery date

Tell us the address, the dates and the headcount. We size the order and confirm the route.

Call (334) 325-9246